Get The Most Updated E-S4HCON2022 Dumps To SAP Certified Technology Specialist Certification [Q33-Q50]

Share

Get The Most Updated E-S4HCON2022 Dumps To SAP Certified Technology Specialist Certification

SAP Certified E-S4HCON2022  Dumps Questions Valid E-S4HCON2022 Materials


SAP S/4HANA Conversion and SAP System Upgrade Certification Exam Details:

Passing ScoreE_S4HCON2022 - 65%
E_S4HCON2020 - 68%
LevelAssociate
Reference BooksADM328, ADM328 (SAP S/4HANA 2020)
Number of Questions40
Schedule ExamSAP Training
Exam CodeE_S4HCON2022
Exam Price$550 (USD)

 

NEW QUESTION 33
Which Guides contain information about SUM phases starting with "EU_CLONE_"?
There are 2 correct answers to this question.
Response:

  • A. The SAP S/HANA Conversion Guide
  • B. The DMO Guide
  • C. The Application Guide
  • D. The major SUM Guide

Answer: A,B

 

NEW QUESTION 34
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. Dedicated application tables are migrated in uptime
  • B. An additional temporary database is used during uptime
  • C. TABIMJJPG is executed in uptime
  • D. The repository is migrated in uptime

Answer: A

 

NEW QUESTION 35
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Support Package Stack update
  • B. Homogenous system copy
  • C. Release upgrade
  • D. Database migration
  • E. Dual Stack split

Answer: A,C,D

 

NEW QUESTION 36
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. ATC (ABAP Test Cockpit)
  • B. SYCM (Simplification Database Content)
  • C. SAT (Runtime Analysis)
  • D. SE80 (Object Navigator)

Answer: A,D

 

NEW QUESTION 37
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to SUM?

  • A. Downtime conversion
  • B. Shadow on target creation
  • C. Downtime migration
  • D. Silent data migration (SDM)

Answer: C

 

NEW QUESTION 38
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
  • C. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • D. After the SUM roadmap step "Execution" is finished and before "Postprocessing"

Answer: A

 

NEW QUESTION 39
You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?
Please choose the correct answer.
Response:

  • A. /ASU/START (Start ASU Toolbox)
  • B. /ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)
  • C. /ASU/SSM (ASU Simple Schedule Manager)
  • D. /ASU/SHOW_NOTE (Show SAP Note via Web-Browser)

Answer: A

 

NEW QUESTION 40
When using the DMO of SUM, which files can be handled by SUM in the download directory?
There are 2 correct answers to this question.
Response:

  • A. MIGRATE J5T_DUR_XML file from a previous run
  • B. Parameter file SAPup_add.par
  • C. Breakpoint configuration file SAPUPPHAS.BRK
  • D. Stack XML file calculated by the Maintenance Planner

Answer: A,D

 

NEW QUESTION 41
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?

  • A. EU_CLONE_MIG_DT_CREATE
  • B. EU_IMPORT_ALL
  • C. EU_CLONE_MIG_DT_RUN
  • D. EU_CLONE_MIG_SOT_RUN

Answer: C

 

NEW QUESTION 42
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Standalone AS ABAP with SAP_BASIS 752 and above
  • B. SAP Solution Manager 7.2
  • C. SAP S/4HANA Server 1809 and above
  • D. SAP ECC system from SAP ERP 6.0 EHP 8

Answer: A,C

 

NEW QUESTION 43
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:

  • A. By searching for transport requests named <SID>K0<number>
  • B. By searching for transport requests in DIR_TRANS, subdirectory "transport"
  • C. By searching for transport requests that are assigned to the project SAP_ADJUST
  • D. By searching for transport requests in the file umodauto.Ist

Answer: D

 

NEW QUESTION 44
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages of the support package stack, calculated by the maintenance planner
  • B. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
  • C. The SAP support packages in the download directory that are newer than the selected support package stack
  • D. The SAP support packages that will be bound to the conversion

Answer: C

 

NEW QUESTION 45
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. As part of the cleanup process
  • B. Before the downtime starts
  • C. At the end of the downtime
  • D. Early in the downtime

Answer: B

 

NEW QUESTION 46
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Assign the transport request as a modification adjustment transport
  • B. Manually activate the adjusted dictionary objects
  • C. Create "modified* versions of the objects that you need to adjust
  • D. Release the transport request containing the modification adjustment

Answer: A,C

 

NEW QUESTION 47
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. During the SUM technical downtime
  • B. Before the start of the SUM technical downtime
  • C. During the Execution roadmap step
  • D. After SUM has ended

Answer: A

 

NEW QUESTION 48
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the most recent entries in SAPup.log
  • B. Check the messages shown by the SUM UI
  • C. Check the system log (transaction SM21) of the SAP system
  • D. Check the most recent entries shown in file sapevt.trc

Answer: A,B

 

NEW QUESTION 49
What are the benefits of using the Benchmarking option of the DMO for SUM?
There are 2 correct answers to this question.
Response:

  • A. You can record the modification adjustment during migration and use the transports in the next runs.
  • B. You can find the optimal number of parallel R31oad processes by monitoring host performance.
  • C. You can verify that the content of the download directory matches the stack.XML file.
  • D. You can obtain migration duration files that can be used to optimize the next runs from a previous benchmark run.

Answer: A,B

 

NEW QUESTION 50
......


SAP E-S4HCON2022 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe the necessary manual preparation and follow-on activities for SUM
  • SUM Monitoring and Troubleshooting
Topic 2
  • Describe and perform the actions necessary during the SAP S
  • 4HANA conversion prepare phase
  • Monitor and troubleshoot the SUM procedure
Topic 3
  • Perform the modification adjustment with SPDD and SPAU
  • Handling of an SAP System Landscape
Topic 4
  • Describe the handling of the SAP system landscape during SAP S
  • 4HANA conversion
  • Perform the SUM execution part, including DMO
Topic 5
  • Describe the factors influencing downtime and techniques to reduce downtime
  • SAP S
  • 4HANA Conversion Prepare Phase

 

E-S4HCON2022 Premium PDF & Test Engine Files with 72 Questions & Answers: https://prepaway.vcetorrent.com/E-S4HCON2022-valid-vce-torrent.html